Inaugurated in 2014, the RATP T6 Châtillon–Véliz–Viroflay line is the first to use STE6 trams, the longest that Translohr makes (46 m). The opening of the first underground section of the line, including the Viroflay tunnel (1.6 km) with a 10% gradient is scheduled for 11 June 2016.